115 Trainsets were built between 2014 and 2018, for use on the Thameslink network, as part of the Thameslink Programme in the United Kingdom. As of 2021, they are operated by Govia Thameslink Railway.
The first train arrived in the UK by the end of July 2015, and was delivered to the Three Bridges depot. The first test run on the Brighton Main Line took place in December 2015. All units were accepted by Thameslink by the Summer of 2018, and by the end of 2019 all were in passenger service.
In terms of carriages, the Class 700 fleet, at 60 eight-car and 55 twelve-car units, is over double the size of the old Thameslink fleet. This increase has been used not only to enhance capacity, but also to expand the Thameslink network.